Segment 3B

Project Details
|
Length: 10.2 miles Responsible Entity: NET RMA Project Type: TOLL ROAD From: SH 31 Status: Completed Opened: March 28, 2013 |
Toll 49 Segment 3B was delivered using the Design-Build development concept. This segment extends from SH 31 north to I-20, a distance of approximately 10.2 miles. CH2M Hill, the Design-Build developer, was selected in June 2010. The NET RMA received funding for Toll 49 Segment 3B through a State Infrastructure Bank Loan and a Toll Equity Loan provided by TxDOT. Construction took approximately 22 months, with Toll 49 - Segment 3B opening to traffic as a Toll Road on March 28, 2013. |
![]() |